Taachco energy infrastructure projects

546 MW Combined-Cycle Power Plant

The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.

546 MW Combined-Cycle Power Plant
Power

546 MW Combined-Cycle Power Plant

• The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.
• The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.
• The first gas unit was connected to the national grid in June 2024, and the second unit in October 2024. Upon completion of the steam unit, the total capacity of the plant will reach 546 MW.
• The 546 MW Chadormalu Combined-Cycle Power Plant stands as a symbol of energy independence for the country’s major industries and represents a significant step toward energy security, optimized consumption, and sustainable development in Iran.

  • Project typePower
  • Project statusIn Progress
  • LocationArdakan County, Yazd Province
  • The 546 MW Chadormalu Combined-Cycle Power Plant, located in Ardakan County, Yazd Province, has been constructed to support stable electricity supply for industrial and mining complexes.

    The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.

    Technical Specifications

    The plant consists of two gas units, each with a capacity of 183 MW, and one steam unit of 180 MW, designed to provide reliable power to Chadormalu’s industrial and mining facilities.

    The first gas unit was connected to the national grid in June 2024, and the second unit in October 2024. Upon completion of the steam unit, the total capacity of the plant will reach 546 MW.

    Scope of Work

    The 546 MW Chadormalu Combined-Cycle Power Plant stands as a symbol of energy independence for the country’s major industries and represents a significant step toward energy security, optimized consumption, and sustainable development in Iran.

    Project Timeline

    1. لورم ایپسوم1405/04/15

      لورم ایپسوم متن ساختگی

    2. لورم ایپسوم1405/04/16

      لورم ایپسوم متن ساختگی

    3. لورم ایپسوم1405/04/24

      لورم ایپسوم متن ساختگی

    4. لورم ایپسوم1405/04/27

      لورم ایپسوم متن ساختگی

    Achievements

    لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است. چاپگرها و متون بلکه روزنامه و مجله در ستون و سطرآنچنان که لازم است و برای شرایط فعلی تکنولوژی مورد نیاز و کاربردهای متنوع با هدف بهبود ابزارهای کاربردی می باشد. کتابهای زیادی در شصت و سه درصد گذشته، حال و آینده شناخت فراوان جامعه و متخصصان را می طلبد تا با نرم افزارها شناخت بیشتری را برای طراحان رایانه ای علی الخصوص طراحان خلاقی و فرهنگ پیشرو در زبان فارسی ایجاد کرد. در این صورت می توان امید داشت که تمام و دشواری موجود در ارائه راهکارها و شرایط سخت تایپ به پایان رسد وزمان مورد نیاز شامل حروفچینی دستاوردهای اصلی و جوابگوی سوالات پیوسته اهل دنیای موجود طراحی اساسا مورد استفاده قرار گیرد.